Center St Ludlow – MADOT

MassDOT and the Town of Ludlow are reconstructing Center Street/Route 21 from Sewall Street to Beach Street in Ludlow. Work by the contractor on Springfield Water and Sewer Commission infrastructure includes removal and relocation of the existing hydrants in Center Street; adjustment of water meter vault frame and cover; removal and replacement of existing water valve boxes and water service valve boxes in Center Street and Sewall Street; installation of new 24-inch bell joint clamps (BJC) in Center Street; and installation of new 8-inch BJC in Sewall Street and White Street.

Commission documents related to project materials, installation, and project details are provided below:

Material Specifications
Guidelines and Policies
Standard Details