Contractors
Guidelines and Policies

The Springfield Water and Sewer Commission presents these technical documentation manuals to educate and guide prospective and current approved contractors to the guidelines and policies regarding construction of the Commission’s water and sewer infrastructure.

The Guidelines and Policies Manual is divided into three distinct sections.

  • Guidelines and Policies
  • Step by step instructions that govern how work is to be performed on the Commission’s transmission and distribution system.
  • Detailed Drawings
  • Detailed CAD drawings showing water and sewer construction configurations to be used with appropriate design specifications.
  • Material Specifications
  • Instructions on the materials to be used on Commission construction and maintenance projects.

You may print or view manuals/pages at your discretion.

For more information contact the Commission at 413-310-3501